Preferred Sands, LLC.
Resin Coated Frac Sand Plant
Bloomer, Wisconsin
Greenfield resin coated frac sand plant to produce approximately 120 tons per hour of resin-coated proppant. This project includes the complete resin coating facility, rail unloading, six raw sand silos, six finished product silos and truck and rail load-out systems.
SCOPE OF WORK
Mouat has turnkey responsibility for the entire facility including all design, procurement, system PLC controls, construction and startup. Mouat’s concept stream-lined the process from the owner’s original design, eliminating many units in the facility. This reduction in equipment reduced the capital cost in excess of 20 percent and will also reduce the operating cost of the facility.
MATERIAL
Resin Coated Sand
PROCESSING CAPACITY
120 tons per hourFEATURES
- Four Webac mixers
- Raw Sand Silos (500 tons each)
- Finish Product Silos (500 tons each)
- Rail and Truck load-out
DESIGN / ENGINEERING / CONSTRUCTION
Mouat provided concept development, engineering and project management services.
Construction services to be provided.